Configure primary and secondary equipment.
The relative reduction in building area and floor area eliminates many civil engineering links, saves building materials, and reduces environmental pollution.
The use of environmentally friendly integrated materials for arranging power distribution compartments saves the length of optical cables and cables, reduces construction costs, and facilitates installation and rapid grid connection.
It can meet the technical specification requirements such as fire prevention, heat preservation, sealing, dust prevention, ventilation, and corrosion resistance.
Meet the requirements and specifications for distributed photovoltaic grid connection across the country.
Integrated installation and wiring are completed in the factory, which saves equipment, reduces on-site workload, and makes the equipment more integrated.
The cabin of the photovoltaic prefabricated cabin substation uses high-strength metal alloy as the outer shell of the cabin equipment, which has high compressive capacity and structural strength.
One-stop turnkey project.















